INCA – Google Party

An opportunity for problem solving skill…
Our client required a cantilevered roof over a performance stage but the available space for a base structure was severely limited. A full survey with ground penetrating radar along with our usual comprehensive paperwork package allowed us to secure the structure with ground anchors – something not normally permitted in Royal Parks.
The finished structure included a protected area for technical equipment and a slender look to match the designers concept.