Adidas X Ji Won Choi

Working for Family Ltd, Rigging Team were responsible for the design, supply and installation of a substantial truss and scaffold grid to support an array of lighting equipment.
Working in collaboration with the venues structural engineers, we installed 40 eyebolts into the concrete slab ceiling, each tested, labeled and detailed on an accurate drawing.
Our team took a last minute request to install a gauze around the scaffold staircase in their stride. Access could only be undertaken by climbing the structure and the bright white gauze required careful handling in order that it didn’t get marked.